AIA FORM G704 PDF

Do whatever you want with a Aia G fill, sign, print and send online instantly. Securely download your document with other editable templates, any time, with. The Work performed under this Contract has been reviewed and found, to the Construction Manager’s and Architect’s best knowledge, information and belief. THIS TEMPLATE HAS BEEN REPLACED WITH THE UPDATED VERSION AND WILL RETIRE ON MAY 31, IF YOU CONTINUE TO PURCHASE.

Author: Arashikora Samujora
Country: Belgium
Language: English (Spanish)
Genre: Health and Food
Published (Last): 19 July 2004
Pages: 242
PDF File Size: 8.71 Mb
ePub File Size: 9.92 Mb
ISBN: 690-8-21902-453-6
Downloads: 76397
Price: Free* [*Free Regsitration Required]
Uploader: Gardagrel

Primary management of the project is the responsibility of the Project Management Team, comprised of one representative from each of the parties.

C provides the terms under which the owner member will fund the SPE in exchange for the design and construction of the project. The non-owner parties are compensated on a cost-of-the-work basis. The consultant, who may or may not be an architect or other design professional, may perform a wide ranging array of services for the owner, including programming aoa planning, budgeting and cost estimating, project criteria development services, and many others, commencing with initial data gathering and continuing through to post occupancy.

AIA Document G— breaks the contract sum into portions of the work in accordance with a schedule of values prepared by the contractor as required by the general conditions. If construction administration services are to be provided using B—, which is not recommended, care must be taken to coordinate it with the appropriate general conditions of the contract for construction.

The construction manager provides the owner with a guaranteed maximum price proposal, which the owner may accept, reject, or negotiate.

D—, Methods of Calculating Areas and Volumes of Buildings This document establishes definitions for methods of calculating the architectural area and volume of buildings.

No Rights to the AIA 2007 Documents after October 2018

Regardless of whether the document is set to expire at the end of October or Mayparties are strongly encouraged to begin using the version for the AIA documents now or risk being precluded from finalizing their contract document. C— is coordinated with C— in order to implement the principles of integrated aiw delivery, including the accomplishment of mutually-agreed goals. AIA Document G— was developed as a directive for changes in the work which, if not expeditiously implemented, might delay the project.

D provides model language with explanatory notes to assist users in adapting those documents for use on a sustainable project. In AIA Document Auathe parties agree on the time allowed for completion or correction of the corm, the date when the owner will occupy the work or designated portion thereof, and a description of responsibilities for maintenance, heat, utilities and insurance. C— replaces C— expired May To avoid confusion and ambiguity, do not use this construction management document with any other AIA construction management document.

  MALACHITE CASKET PDF

D—, Project Checklist The project checklist is a convenient listing of tasks a practitioner may perform on a given project.

A—, as a standard form document, cannot cover all the particulars of a project. AIA Document C— is suitable for use with all types of consultants, including consulting architects and may be used with a variety of compensation methods. The form asks the requesting party to list the relevant drawing, specification or submittal reviewed in attempting to find the information.

Exhibit B provides a menu of briefly described services that the parties can select and augment to suit the needs of the project. The major difference between AIA Documents GCMa— and G— is that the from of the construction manager adviser, along with those of the owner, architect and contractor, is required to validate the change order. AIA Document A provides general guidance to users preparing bidding and construction contract documents for determining the proper location of information to be included in bidding documents, the contract for g74, General Conditions, Supplementary Conditions, and Division 01 General Requirements and Divisions Specifications.

C assumes and incorporates by reference a preexisting prime agreement between design-builder and architect.

B is extremely abbreviated and is formatted more informally than other AIA agreements. B— replaces BCMa— expired Although A and B share some similarities with other agreements, the Small Projects family should NOT be used in tandem with agreements in other document families without careful side-by-side comparison of contents. A— replaces A— expired AIA Document G— is particularly useful as a single point of reference when parties interested in the project call for information during the bidding process.

Both AIA Documents B— and C— are based on the premise that one or more separate construction contractors will also contract with the owner. AIA Document B— was developed to replace B— Parts 1 and 2, and B— expiredbut it more closely follows the format of B— If you have any questions about the recent AIA revisions or drafting a contract for your particular project, please do not hesitate to contact us.

AIA Document B— uses the traditional division aaia services into Basic and Additional Services but adds a new Pre-Design Foem article that includes items such as assessment of project feasibility, layout, and regulatory requirements. B was renumbered only in same content as BINT—, expired It is intended that the joint venture, once established, will aai into an agreement with the owner to provide professional services.

  MACKIE 1202-VLZ PRO PDF

The contractor is required to list any exceptions to the sworn statement provided in GA—, and may be required to furnish to the owner a lien bond or indemnity bond to protect the owner with respect to such exceptions. Modifications to G— are shown as tracked changes revisions—that is, additional material is underlined; deleted material is crossed out. C is not intended for use in competitive bidding and relies upon an agreed to sia sum, which can be either a stipulated sum fixed price or cost of the work plus a fee, with a guaranteed maximum price.

A— obligates the contractor to perform the work in accordance with the contract documents, which include A with its attached aoa, supplementary and other conditions, drawings, specifications, addenda, and modifications.

Document Titles and Prices | AIANH

AIA Document is coordinated with AIA Document C— in order to implement the principles of integrated project delivery, including the accomplishment of mutually-agreed goals. Though written primarily to support a project using integrated project delivery IPDE may also be used on projects delivered by more traditional methods. It is often used for planning, feasibility studies, post-occupancy studies, and other services that require specialized descriptions.

It serves as a written record of the exchange of project information and acts as a checklist reminding the sender to tell the recipient what exactly is being sent, how the material is being sent, and why it is being sent.

The document is intended to clarify the assumptions, roles, responsibilities, and obligations of the parties; to provide a clear, narrative description of services; and to facilitate, strengthen, and maintain the working and contractual relationship between the parties. It provides space for the signatures of the owner, contractor, construction manager adviser, and architect, and for a complete description of the change.

Upon receipt of a completed G—, the contractor must promptly proceed with the change in the work described therein.

It allows the owner to tailor the proposal request to address the specific needs of the project.